Integrated Water project and environmental impact assessment

Project data

Client
Bilateral Agreement between Italian and Bulgarian Administration
Region / Country
EUROPE / Italy and Bulgaria
Period
2002-2007

Client Challenge

The project includes: feasibility study; environmental impact assessment; development plan, and preliminary design

What we've done

Preparing the feasibility study:

  • analysis of the technical aspects of the project;
  • analysis of the legal aspects and local regulations;
  • analysis of the risk construction and operation.

For the environmental impact assessment:

  • identification of the key impacts, their magnitude, significance and importance; For the development plan:
  • topography, inventory of water sources, existing networks and reservoirs;
  • creation of a water bodies data base according to the European Water Framework Directive 2000/60/CE;
  • population and land use criteria;

Client benefits

Updated study according to the growth forecast in the Cerni Ossam Valley and, by means of the application of a new technology for the dam design, the optimization of the project cost.

ANDREA ZATTONI
Mail: andrea.zattoni@cesi.it
Phone: +39 035557.7577

SOCIAL MEDIA

Follow us on