SIA GILGEL GIBE III–HYDROELECTRIC POWER PLANT–ETHIOPIA

Project data

Client
Federal Democratic Republic of Ethiopia (FDRE)
Region / Country
AFRICA / Ethiopia
Period
2007 - 2009

Client Challenge

The task was to obtaining the consent for the achievement of the work and the access at the loans from the World Bank (WB) and the African Development Bank (ADB).

What we've done

The EIA was achieved. The features related to the FDRE's regulatory framework and to the ADB and WB's guidelines were considered. The positive and negative impacts were analyzed as monitoring and mitigation processes were designed

Client benefits

The Client had the opportunity to proceed with the authorization procedure with a complete documentary support related both to the technical issues and to the administrative and legal framework which is required for the loans' access.