Feasibility study of Interconnecting the Electrical Networks of Dubai UAE and IRAN

Project data

Client
DEWA
Region / Country
MIDDLE EAST / Dubai, Iran
Period
2008

Client Challenge

  • Data collection and analysis
  • Preliminary simplified screening study to assess possible location of converter stations and AC or DC lines routes in terms of:
  • Detailed analysis of the selected solution
  • Definition of the functional specifications of the converter stations and of the AC or DC lines
  • Routing of the AC or DC line

What we've done

  • Data collection and analysis
  • Preliminary simplified screening study to assess possible location of converter stations and AC or DC lines routes in terms of:
  • Detailed analysis of the selected solution
  • Definition of the functional specifications of the converter stations and of the AC or DC lines
  • Routing of the AC or DC line

ANDREA MEOLA
Mail: andrea.meola@cesi.it
Phone: +39 022125.4746

SOCIAL MEDIA

Follow us on